Performance

Case Studies

Casing reconnect- March 2012

To reinstate pressure integrity of the clients 9 5/8” casing string.

Read More

 

Barrier Assurance

The client was looking to achieve effective zonal isolation during cement jobs, having previously experienced losses due to depleted reservoir zones. They were looking for a solution to act as a contingency in the event of cement failure as well as additional support for the cement if required. Isolation was essential in order for the planned DIACS (Downhole Instrumentation and Control System) completion to be installed.

Read More


Damaged Casing

Meta removed a section of casing damaged by the injection of corrosive fluids, on three production wells and get the wells back into production as quickly as possible. 

Read More
 


Zonal Isolation

The client had a requirement to isolate different zones in a horizontal well to allow high pressure (up to 10,000 psi) hydraulic fracturing of isolated zones. 

Read More